Getting the Electrical work done!

One of the first things we did was run power for the lights. I decided to do switched plugs, that way if I wanted to change or add more light I just needed to attach a cord and plug in.

Getting the Electrical work done! lights
Getting the Electrical work done! lights 2

I ran 3 – 20amp circuits in the Shop:

Back area:

Back shop plugs

Front:

Front Shop Plugs

And side:

Shop side plugs

Hung the lights and fan in the office area:

Office Lights

Then ran 2 circuits Back and side. Both are shown here. You can see the hole in the side circuit, I will be adding plugs to the desk area when I build it.

Office Plugs

Thats it for now. I will post some stuff on the AC later…