Shop interior framing

We got the interior framing done. We started with the external walls:

Then we added the fire breaks: Thanks to the guys on MeWe for helping me decide to add them. https://mewe.com/join/home_workshop_

Next we added the slats to the ceiling:

We got the spray foam done in between things

Got the interior office/man cave wall built. It is 15 feet in and the entire 30 foot length.

And here is the 10×10 storage room:

Next up ceiling and ceiling